Alfabs Engineering are fabricators of heavy structural steel, detailed pipe duct work and much more. Our team undertakes a wide range of fabrication projects supporting the infrastructure, construction and resources industries across New South Wales and beyond.
Alfabs successfully delivers the most complex of fabrication projects across Australia including:
CC3-certified to AS/NZS 5131 for welding, architecturally exposed structural steel (AESS) and protective coatings, Alfabs Engineering are fabricators of heavy structural steel, detailed pipe duct work and much more. The main workshop comprises of 3,000sqm undercover, a 30-tonne and three 15-tonne overhead cranes (two pair in tandem) with 7.2 metres under hook. The workshop size enables the use of mobile cranes to supplement lifting capacities. Alfabs have fabricated structures that exceed 150 tonne sections in the main workshop, proving no job is too big for our team.
The employees of Alfabs Engineering have achieved a diverse range of fabrication projects since the inception of the business in the 1950s. These projects have promoted experience and flexibility, allowing Alfabs to become one of the industry’s leading suppliers in heavy, medium and light gauge steel fabrication.
By choosing Alfabs, you’re guaranteed:
Our purpose-built workshop includes 5 acres of land utilised as a hardstand, pre-assembly area. In conjunction with Alfabs Protective Coating and Transport business units, Alfabs Group boasts the ability to provide a design-to-delivery solution for all your site installation projects, site maintenance and repairs, fabrication, protective coatings and blasting and transport requirements.
Contact us today to get started on your next project